Section specimens

Acceptance page for the new marketing blocks: FAQ, testimonials, tabs, showcase and split.

FAQ

Frequently asked questions

Deployment, data and security of the process control agent.

Do we need to replace our existing control system?

No. The agent reads DCS / PLC data through an industrial gateway and proposes moves after simulating them; engineers decide whether and when to apply them. Interlocks and control loops stay as they are.

Does any data leave the plant?

By default everything runs on site. Only authorised maintenance logs are sent back for remote diagnosis.

How long does a line take to go live?

Usually about eight weeks: data onboarding, modelling and offline validation, then a closed-loop trial.

Stacked · centred

Only one question opens at a time here?

Yes. Opening another question closes the current one.

Does it work without JavaScript?

Yes. Native details elements handle opening and closing.

Customers

What teams achieved with it

Feedback from water, steel and chemical plants.

Live in 120+ plants

  • We cut aeration power by 18% in two months while total nitrogen stayed under the limit. And the night shift no longer babysits the screens.

    王立群

    Process Lead, Municipal WWTP

  • Simulating every move before it goes live is what made us comfortable actually applying the recommendations.

    Chen Yu

    Environmental Manager, Steel Group

  • A change of coal blend used to take two or three days to settle. Now the flue gas is stable within the same shift.

    李婧

    Shift Supervisor, Sintering Plant

  • Keeping all data on site meant our security review passed on the first round.

    Marco Rossi

    Head of IT, Chemical Park

  • Every recommendation comes with its simulation, so post-mortems can finally explain why we made each change.

    赵晨

    Process Engineer, Distillation Unit

  • Eight weeks from data onboarding to a closed-loop trial — faster than we planned for.

    Priya N.

    Director of Digital, Water Utility

  • Not a single interlock was touched, so our senior operators got on board quickly.

    刘洋

    Operations, Thermal Power Plant

  • Chemical dosing fell by 12% and swings are smaller, which also takes pressure off the lab.

    孙悦

    Station Manager, Industrial WWTP

Tint panel · latest 6 · slow

  • Chemical dosing fell by 12% and swings are smaller, which also takes pressure off the lab.

    孙悦

    Station Manager, Industrial WWTP

  • Not a single interlock was touched, so our senior operators got on board quickly.

    刘洋

    Operations, Thermal Power Plant

  • Eight weeks from data onboarding to a closed-loop trial — faster than we planned for.

    Priya N.

    Director of Digital, Water Utility

  • Every recommendation comes with its simulation, so post-mortems can finally explain why we made each change.

    赵晨

    Process Engineer, Distillation Unit

  • Keeping all data on site meant our security review passed on the first round.

    Marco Rossi

    Head of IT, Chemical Park

  • A change of coal blend used to take two or three days to settle. Now the flue gas is stable within the same shift.

    李婧

    Shift Supervisor, Sintering Plant

Four picked · falls back to grid

  • Simulating every move before it goes live is what made us comfortable actually applying the recommendations.

    Chen Yu

    Environmental Manager, Steel Group

  • Keeping all data on site meant our security review passed on the first round.

    Marco Rossi

    Head of IT, Chemical Park

  • Eight weeks from data onboarding to a closed-loop trial — faster than we planned for.

    Priya N.

    Director of Digital, Water Utility

  • Chemical dosing fell by 12% and swings are smaller, which also takes pressure off the lab.

    孙悦

    Station Manager, Industrial WWTP

How it works

Work the way your line allows

One process agent, three depths of involvement — pick what your line is ready for.

Advice first, action later

The agent rehearses every move in a virtual sandbox and sends the recommendation with its reasoning.

  • Existing interlocks and control loops stay untouched

  • Every recommendation carries its reasoning and can be traced

  • Nothing runs until an engineer signs off

Straight metallic shapes with a blue gradient

Adjust inside a safe envelope

Set limits and ramp rates; the agent trims setpoints within them.

  • Aeration power down 18% on average

  • Alerts and falls back to advisory before a limit is crossed

Curving abstract shapes with an orange and blue gradient

Data stays on site

Training and simulation run on your own servers, offline if needed.

  • Runs on domestic hardware, fully offline

Curving abstract shapes with an orange and blue gradient

Industry practice

Water and steel

Two production lines, one simulation model.

Municipal wastewater

From influent swings to compliant effluent, dosing and aeration are rehearsed end to end.

  • Influent changes flagged four hours ahead

  • Effluent stays inside the permit

Curving abstract shapes with an orange and blue gradient

Steel sintering

Wind boxes and ignition temperature move together, with air split following the bed.

  • Ignition energy down 9%

  • Wind-box draft tracks automatically

Straight metallic shapes with a blue gradient

On site

From the line to the dashboard

Twenty-four hours on one line

Shift handover, with every adjustment visible in frame.

The same view in the control room

Operators see the same reasoning an engineer sees.

Curving abstract shapes with an orange and blue gradient

Metrics roll up every day

Energy, compliance and alarms archived by shift.

Curving abstract shapes with an orange and blue gradient

Customer stories

Running on real production lines

The process control agent runs every day in wastewater, sintering and distillation plants.

Curving abstract shapes with an orange and blue gradient

Municipal wastewater

Aeration energy down 18% with ammonia consistently in spec.

Read the story
Curving abstract shapes with an orange and blue gradient

Steel sintering

Burn-through temperature swings cut in half.

Read the story
Curving abstract shapes with an orange and blue gradient

Chemical distillation

Higher overhead purity and 9% less steam per tonne.

Straight metallic shapes with a blue gradient

Industrial water supply

Coordinated pumps cut night-time power costs by 22%.

Curving abstract shapes with an orange and blue gradient

Combined heat and power

Load forecasts four hours ahead make peaking easier.

Ways to use it

Connect it your way

Curving abstract shapes with an orange and blue gradient
Observe first

Advisory

The agent suggests setpoints; operators approve them.

Curving abstract shapes with an orange and blue gradient
Self-optimizing

Closed loop

Setpoints are written directly within safe limits.

Straight metallic shapes with a blue gradient
Data stays on site

Edge deployment

Runs on plant servers and keeps working offline.

Three industries, one method

Curving abstract shapes with an orange and blue gradient

Water

Coordinated control from intake to discharge.

Straight metallic shapes with a blue gradient

Steel

Sintering, blast furnace and converter tuned together.

Curving abstract shapes with an orange and blue gradient

Chemicals

Distillation and reaction units held at their optimum.

In the plant

Turn process know-how into control loops that run

The agent connects to existing PLC / DCS hardware and keeps pulling the process back to its optimum.

Curving abstract shapes with an orange and blue gradient

Whole-process coordination

One model from intake to discharge

Influent load, aeration state and effluent quality are reasoned about together, so dosing and aeration move as one.

Curving abstract shapes with an orange and blue gradient
Curving abstract shapes with an orange and blue gradient
Straight metallic shapes with a blue gradient

Three industries

One method, three production lines

From municipal wastewater to steel sintering and chemical distillation, the model is re-tuned on site data, not a template.

Curving abstract shapes with an orange and blue gradient
  • Municipal wastewater

    Aeration energy down 18% with ammonia consistently in spec.

  • Steel sintering

    Burn-through temperature swings cut in half and fewer returns.

  • Chemical distillation

    Higher overhead purity with 9% less steam per tonne.

  • Industrial water supply

    Coordinated pumps cut night-time power costs by 22%.

Take your production line to autonomous operation

  • Works with existing PLC / DCS
  • Pilot in two weeks
  • Pay for verified savings

Prove it on one line first

  • On-site engineer
  • Data stays in the plant

Download the technical white paper

At scale

Already running on real lines

Figures come from live project logs and are updated quarterly.

Control loops
3200+
Data processed
400T
Energy saved
18%
Unattended
7×24

Three industries, one method

Provinces
26
Plants served
120+
Less steam
9%
Lower night power
22%
Steadier temps
50%

Where we run

Run from Changsha, serving plants at home and abroad

  • Changsha HQ
  • Beijing
  • Shanghai
  • Guangzhou
  • Wuhan
  • Chengdu
  • Lanzhou
  • Lhasa
  • Xi'an
  • Shenyang
  • Kunming
  • Urumqi
  • Haikou

Sample figures

Sample sites
11
Provinces
26
Plants served
120+
Remote support
7×24
  • 示例 · 水务集团
    ISO 9001